Construction activity: Parking Lot 17 and 19 driveway conversion

(SACRAMENTO)

On Friday, Aug. 8, four standard stalls at the northeast end of Lot 17 and northwest end of Lot 19 will be repurposed into a driveway, creating a connection between the two lots.

The existing bollards dividing the lots will be removed, the existing striping for the four stalls will be removed and the space will be restriped to reflect its intended use as a driveway.

Area of driveway conversion.

For further assistance, please contact Jake Bertacchi at j.bertacchi@ccm.to or Wes Ramirez at wesramirez@ucdavis.edu.